Calendars: Difference between revisions

From Vanishing Point Wiki
Jump to navigationJump to search
m (Added additional deconstructed cube graphic)
mNo edit summary
 
(One intermediate revision by the same user not shown)
Line 13: Line 13:
The answer is interrobang.
The answer is interrobang.
</spoiler>
</spoiler>
To next puzzle: [[Repair_Table|Repair Table]].

Latest revision as of 02:06, 18 January 2007

Calendars-1.png

Calendars-2.png Calendars-3.png Calendars-4.png Calendars-5.png Calendars-6.png Calendars-7.png

<spoiler> In the Las Vegas video, Loki recites the months in the following order: June, January, April, March, May, and February. The months correspond with the list of numbers. For example, June goes with #1. Then, the numbers in each month are the days that should be filled in. The month's then are to be placed in a deconstructed cube. This link, [1]shows the resulting shape. This link, [2]shows an alternative representation where the May and June pages don't need to be rotated 180 degrees and how the handwritten entries link the pages to form the cube. </spoiler>

<spoiler> At this point, there is a question mark and an exclamation mark, which is also known as an interrobang. The answer is interrobang. </spoiler>

To next puzzle: Repair Table.