Calendars: Difference between revisions

From Vanishing Point Wiki
Jump to navigationJump to search
No edit summary
No edit summary
Line 6: Line 6:
In the Las Vegas video, Loki recites the months in the following order: June, January, April, March, May, and February. The months correspond with the list of numbers. For example, June goes with #1.
In the Las Vegas video, Loki recites the months in the following order: June, January, April, March, May, and February. The months correspond with the list of numbers. For example, June goes with #1.
Then, the numbers in each month are the days that should be filled in.
Then, the numbers in each month are the days that should be filled in.
The dates connect and May and June's dates form a cube wth April and February.
The month's then are to be placed in a deconstructed cube. This link, [http://www.thebruce.net/stuff/calendars.jpg]shows the resulting shape.
 
[http://en.wikipedia.org/wiki/Interrobang]resulting shape
</spoiler>
</spoiler>


<spoiler>
<spoiler>
At this point, there is a questionmark and an exclamation mark, which is also known as an interrobang.
At this point, there is a question mark and an exclamation mark, which is also known as an interrobang.
The answer is interrobang.
The answer is interrobang.
</spoiler>
</spoiler>

Revision as of 06:16, 11 January 2007

Calendars-1.png

Calendars-2.png Calendars-3.png Calendars-4.png Calendars-5.png Calendars-6.png Calendars-7.png

<spoiler> In the Las Vegas video, Loki recites the months in the following order: June, January, April, March, May, and February. The months correspond with the list of numbers. For example, June goes with #1. Then, the numbers in each month are the days that should be filled in. The month's then are to be placed in a deconstructed cube. This link, [1]shows the resulting shape. </spoiler>

<spoiler> At this point, there is a question mark and an exclamation mark, which is also known as an interrobang. The answer is interrobang. </spoiler>